Geochemical analysis of water samples to provide a pre-reclamation assessment of seasonal variations of acid and metal concentrations in Knight's Branch help evaluate the reclamation project.
An environmental impact study is done for the abandoned Ely copper mine. The extent of contamination is studyed along with the type and chemical composition of the mine waste piles.